This hybrid pre-engineered building was constructed to support Juicing Systems’ production and operational needs. The facility includes a spacious industrial floor, second-storey office space, upgraded utilities, and a grade-level loading bay. Final-phase coordination ensured HVAC, electrical, and mechanical systems were completed to spec, allowing Juicing Systems to move in and begin operations without delay.
Juicing Systems needed a new facility to support its production and distribution operations. The building includes a large industrial workspace, drainage systems, upgraded power and water infrastructure, and a second-floor office space. HVAC, electrical, and mechanical work were completed to ensure the building was fully functional and tailored to its equipment needs.
Plan B Contractors worked closely with HVAC, electrical, and mechanical contractors to complete and fine-tune key systems. From soundproofing upstairs offices to coordinating final water and drainage hookups, the project brought together technical execution and client-facing coordination.