Boyd Autobody & Glass
This tenant improvement included installing multiple hoists and frame-straightening rails throughout the 6,000 sq ft workshop and placing a new 5″ slab throughout. Also included was a 1,500 sq ft office space with an upstairs storage space, staff room, compressor room and a staff washroom. This build had an in-depth mechanical scope of work along with the installation of a new paint booth with a below slab air-circulation system. The shop area included a 400 sq ft interior wash bay with full-height steel stud walls finished with drywall and Fibreglass Reinforced Panels (FRP).